Employment OS for your Business

2026-2027 | Shutdowns & Projects

Field • Mackay, Queensland 4740, Australia • Casual
AI Job Summary
  • Proven experience in the relevant discipline (Mechanical Fitting, Boilermaking, Project Management or Supervision).
  • Current and valid trade qualifications required.
  • Previous mine site experience and current mine site qualifications/tickets for site-based roles.

Role Type

On-site • Temporary • Casual • Trade Qualified

Description

ABOUT KEY SOLUTIONS GROUP

Key Solutions Group (KSG) are a major stakeholder in engineering projects, overhauls, heavy and light manufacturing, construction and maintenance services for the mining, ports, and utility industries throughout QLD and NSW.

Our mission is to Attract, Develop and Retain motivated and skilled staff who thrive and excel as a team, undertaking exciting and challenging projects. Our vision is to provide excellence whilst fostering teamwork, innovation and exceptionally high standards of customer service.

THE OPPORTUNITY

We are preparing for a significant period of works both locally in Mackay and across various mine sites within the Bowen Basin — commencing July 2026 through to July 2027. This includes workshop overhauls, site installations, structural upgrades, and equipment refurbishment works across multiple projects.

 

Due to the volume and diversity of upcoming works, we are currently seeking experienced and motivated tradespeople in the following disciplines:

  • Project Managers
  • Project Supervisors
  • Mechanical Fitters
  • Boilermakers

MINE SITE PROJECTS

All positions below require previous mine site experience and current mine site qualifications.

  • Monorail Overhaul | 20th July | 18 -20 Week Duration | 5/2 Roster
  • Major CHPP Shutdown | 17th August | 7 Day Duration | Day / Night shift
  • Portal Doors Upgrade & Install | July | 4 Week Duration | 5/2 Roster

MACKAY WORKSHOP PROJECTS

All positions below are Mackay based. Applicants must be locally based or have suitable accommodation in place.

  • Longwall Equipment Overhaul | 17th August | 16 -18 Week Duration | 5/2 Roster on Days / Nights
  • New Build Equipment | 1st September | 12 Week Duration | 5/2 Roster on Days
  • Roof Support (PRS) Overhaul | 14th September | 4 Week Duration | 6/1 Roster on Day / Night shift
  • Longwall Compatibility| 4th January 2027 | 15 Week Duration | 5/2 Roster

WHAT WE’RE LOOKING FOR

  • Proven experience in your trade discipline
  • Current and valid trade qualifications
  • Mine site tickets and qualifications (for site-based roles)
  • Ability to work rotating rosters including day and night shifts
  • Strong commitment to safety, teamwork, and quality outcomes
  • Locally based in Mackay or able to arrange accommodation (for Mackay roles)

HOW TO APPLY

If this sounds like you, apply now. Please note you must be able to provide copies of all your qualifications prior to being confirmed for any works.

Please note: No agency or third-party applications will be accepted at this time.

Company Overview

Key Solutions Group is based in the Paget precinct in Mackay, Queensland and is perfectly positioned to service clients from all over the local region and out to the Coalfields. With a long and proud history in the area and working with an extensive list of clients from all tiers of business, Key Solutions Group is the perfect partner for all of your engineering needs. With a proven end-to-end solution that includes design, draft, certification, fabrication and on-site installation, the highly qualified and experienced team at Key Solutions Group will work closely with you to deliver each project on time, on budget and to the high standard we are known for.